Assembly and Packing

 
  • Assembly is taken by a serious procedures, the total quality control was started from IQC and the key IPQC/OQC are fulfilled in the assembly cycle.
  • Assembly

     
  • Using 5 tier solid carton and thick bag inside to protect the cabinet,
    making sure the cabinets are well delivered during transportation.
  • Packing

     

    top
     
    HomeAbout usProduct ListOEM / ODM Service Contact us繁體中文Español
    COPYRIGHT © 2003-2011 TOMMY BEAR CO.,LTD. ALL RIGHTS RESERVED.
    ISO9001 & ISO14001